Sunday, February 10, 2013

Progress 3

Back into it this morning; Joey was up until 2.30am. The waterproofing man arrived and did his bit; he brought his dog, Ralph.




Dave arrived to spray Meg's room; the 3 Stooges or what?!






Would you let this man roll paint on your wall?


I left them to it while I scrubbed the pantry floor and walls. I want to freshen the walls a little before I pack them with food.


The bathroom is taking shape. The new toilet is blocked off now. Yesterday you could see right through to the end of the bathroom with the old toilet on the left and the hallway on the right.


Walk in shower at the end of the the bathroom.


This wall is at the opposite end to the photo above (lets call it the bath end). The new toilet is on the other side so we're looking back towards it here (I'm standing in the shower).


Here's some of the tiles that we DIDN'T break.


The bath end wall, fully tiled (toilet is on the other side of the wall, to the left). I'm standing in the middle lounge room taking this.


This is where the 2nd toilet and basin will go.








The strips of feature tiles and the ceramic soap/shampoo shelf and foot rest, fitted.


The feature strips inserted. They look a bit like a leopard skin - they look better close up. The shower glass in 1400mm long; we will walk into the shower from the left hand end.


The third feature strip runs at the head of the bath.


There's still a little way to go and Joey is staying tonight. He's done a phenomenal job in 3 days and saved us an enormous amount of money.

Every day we're one day closer.